Prices in this industry are rarely published. That makes buyers anxious, and anxiety is expensive. It lets weak suppliers quote a number that means nothing, and it makes honest suppliers lose orders for being honest. Below are the ranges we see every week in 2026 for standard models, FOB China, plus the factors that move a quote up or down. Use them to test the numbers you receive. Do not use them to fix a budget before you know your own specification.
Read every range under the same conditions. One machine, standard configuration, standard voltage for your country. Film, freight and installation excluded. A price outside these ranges is not automatically wrong. A price far below them deserves a hard look.
Semi-automatic equipment. A semi-automatic auger filler, or a semi-automatic weighing and sealing unit, runs 2,000 to 5,000 US dollars. This suits small batches and factories that fill several products on one line.
Pillow packing machine. A horizontal form fill seal machine with volumetric cup dosing runs 6,000 to 12,000 dollars. Add servo control on the main axis and the film pull, and add 2,000 to 4,000.
Vertical powder machine. A vertical form fill seal machine with an auger filler runs 9,000 to 20,000 dollars. The low end is intermittent motion with a single auger. The high end is continuous motion, servo film pull and dust extraction.
Vertical granule machine. With a linear weigher, 12,000 to 25,000 dollars. With a ten-head multi-head weigher, 20,000 to 38,000 dollars. The weigher is often the most expensive unit on the line, and it is the one that decides your accuracy.
Premade pouch machine. A doypack machine runs 28,000 to 65,000 dollars. Intermittent rotary machines sit at the bottom. High speed machines with zipper, spout and shaped bag stations sit at the top.
Upstream and downstream units. A multi-head weigher alone is 7,000 to 16,000 dollars. A checkweigher is 4,000 to 9,000. A metal detector is 3,000 to 6,000. A ribbon date coder is 300 to 800. A nitrogen flushing kit is 1,500 to 4,000. A cartoner is 25,000 to 70,000.
Five factors move the price more than anything else. Speed is the first. Doubling output rarely doubles the price. It often triples it, because the machine changes from intermittent to continuous motion and from a standard gearbox to servos. Dosing method is the second. A cup is cheapest, an auger is next, a multi-head weigher is the most expensive and the most accurate. Bag type is the third. A premade pouch needs a bag magazine, an opening station and more mechanics than roll film. Build standard is the fourth. Type 304 stainless steel is normal. Type 316, washdown protection and tool-free strip-down add 15 to 40 percent. Options are the fifth. A coder, gas flushing, a tear notch, a label applicator. Each one is small. Together they add 20 percent or more.
The costs that are not in the quote. Ocean freight for one 40 foot container to Europe or the US East Coast was 1,500 to 4,500 dollars in 2026. Import duty and VAT apply on top. Test film costs 300 to 800 dollars. Installation costs 150 to 250 dollars per engineer per day, plus flights and hotel, usually three to seven days. Spare parts in year one need three to five percent of the machine value. Voltage adaptation and labelling rules in your market also cost money. Add all of this up before you compare two quotes, because one quote may include these items and the other may not.
Why one quote is half of the other. Thinner sheet metal, so the frame flexes and the seals drift out of alignment. No safety interlocks, or interlocks that can be bypassed. A CE certificate that covers a different model than the one you are buying. A copied control panel with no spare support. No servo on the film pull, so film waste is two or three times higher at every changeover. No spare parts list, so a thirty dollar part stops your line for two weeks. None of this shows up in a quotation. All of it shows up in year two.
Compare two quotes in eight lines. Ask both suppliers to confirm in writing: the tested speed and bag size range with your product; the dosing type and the accuracy from a real test report; the film type and thickness the test used; the voltage and frequency for your country; what the installation price includes and excludes; the spare parts list with prices; the warranty period and what it covers; and the response time for a breakdown. A supplier who will not put these in writing is telling you how the relationship will go after the invoice is paid.
Payment terms. Thirty percent deposit and seventy percent before shipment is normal. A letter of credit is normal above fifty thousand dollars. Full payment in advance is a warning sign. So is a deposit demand to a personal account.
What to budget. The machine price is about 75 to 80 percent of the landed and installed cost. For a 15,000 dollar machine, budget 19,000 to 20,000 dollars to have it running. Budget the line, not the machine, because a fast machine fed by hand is a slow line.
A note on the cheapest option. A machine that costs thirty percent less, runs twenty percent slower, needs one more operator and wastes more film will cost you more within three years. Do the arithmetic on cost per thousand packs, including labour, film and downtime. That number decides, not the invoice. And ask for the price of the second machine now. A supplier who quotes a fair price on the first machine and a sensible price on the second expects to be around for both.
Guoqiang sends an itemised quotation, not a single number. Each unit, each option, freight to your port, and a spare parts list with prices. Send your product, your bag and your target output, and we return the quotation with a test video of your product on the machine.